spot_img
29.4 C
Philippines
Wednesday, July 16, 2025

Malabon pump stations ready for the rains — LGU

The Malabon City government has given assurance that its pumping stations are fully operational and prepared for the challenges of the rainy season.

The city engineer’s office was tasked to maintain the stations’ optimal condition, even as repairs are ongoing for the navigational gate, a key infrastructure affecting flood control during high tide.

- Advertisement -

Regular inspections and monitoring of the city’s various pumping stations are conducted to ensure readiness.

“The safety and welfare of every Malabon resident is our top priority,” the city government said. Rex Espiritu

LATEST NEWS

Popular Articles