President Ferdinand R. Marcos Jr. leads the inspection yesterday of the ongoing construction of the Cavite-Laguna Expressway (CALAX) Governor’s Drive Interchange in General Trias, Cavite. The project is currently 44% complete and set for full operation by the third quarter of 2025. The 44.6-kilometer CALAX aims to enhance connectivity between Cavite and Laguna, easing congestion on major roads and reducing travel time between CAVITEX and SLEX by about 45 minutes.