spot_img
28.4 C
Philippines
Sunday, November 24, 2024

Villafuerte raps Transport Dept. on Naga airport, PNR Bicol delays

Camarines Sur Rep. Luis Raymund Villafuerte has complained to the Department of Transportation (DOTr) about the inordinate delay in the expansion and improvement of the Naga Airport as well as the rollout of the Philippine National Railways’ South Long Haul (PNR Bicol) project.

Villafuerte mentioned these at the recent Commission on Appointments (CA) committee hearing on the designation of DOTr Secretary Jaime Bautista.

- Advertisement -

The solon bewailed that even though the past administrations had already set aside funds for the modernization of the Naga Airport, this project has failed to take off up to now because of the failure of the Office of the Solicitor General (OSG) to actively participate in the protracted legal battle over the expropriation of private lands to be covered by the extension of this airport’s runway.

Villafuerte, the CA majority leader, also complained to Bautista that despite the PNR Bicol project being a priority undertaking of the Duterte administration under its centerpiece program “Build, Build, Build,” this railway plan has failed to move forward after the initial reports the project would be funded mainly by China and built by a joint venture (JV) of three Chinese companies.

He was referring to the reported signing last January 2022 of a Memorandum of Agreement (MOA) between the DOTr and the JV firms China Railway Group Ltd., China Railway No. 3 Engineering Group Co. Ltd. and China Railway Engineering Consulting Group Co. Ltd. (CREC JV).

This was on a P142-billion Design-Build contract for the design and construction of Phase 1 of this PNR Bicol project, which will cover a 380-kilometer (km) railway from Calamba, Laguna to Daraga, Albay.

“I fully support your nomination, Sec (Bautista), but I just have to put on record that the Naga Airport has been budgeted, and approved by the NEDA (National Economic and Development Authority). It’s a flagship project,” he said.

“When (then-DOTr) Secretary (Arthur) Tugade assumed office (in 2016), that was the first thing I raised to him, but unfortunately, 6 years have passed, nothing,” Villafuerte, who is president of the National Unity Party (NUP) said.

A former Camarines Sur governor, Villafuerte pointed out to Bautista that this Naga Airport project was approved by NEDA during the past Aquino III administration and given a budget to keep it going, but “for six years under the Duterte administration nothing had happened.”

“When I speak and follow up on the Naga Airport, Mr. Secretary, the prime concern is actually safety, because this airport’s landing field is short, it could not accommodate jets like the Airbus 300,” Villafuerte said, adding there was always the danger smaller planes could overshoot the runway.

Hence, the expansion project to extend this short airstrip up to CamSur’s capital town of Pili to ensure safer plane landings, increase passenger traffic and boost local tourism as a longer landing field would enable the airport to accommodate bigger planes or jets.

LATEST NEWS

Popular Articles