spot_img
27 C
Philippines
Saturday, September 21, 2024

Major roads undergo repair, reblocking

- Advertisement -

The Department of Public Works and Highways will continue its reblocking and other repair works on major roads in the metropolis this weekend.

The road works, according to DPWH-National Capital Region director Ador Canlas, will start at 11 p.m. Friday (July 26) until 5 a.m. on Monday after the Metro Manila Development Authority gave the go signal to resume their operations.

Canlas said that road works at Epifanio de los Santos Avenue covering southbound direction from Roosevelt Avenue to Bansalangin Street, 2nd lane from sidewalk; from Magallanes-Baclaran Bus Stop going to Magallanes-Alabang Bus Stop, outer lane; and from Eugenio Lopez Drive to Scout Borromeo (desilting and construction of manhole); and at the northbound direction from before New York Street, 1st lane from sidewalk.

Road works will likewise be undertaken at the northbound direction of Circumferential Road 5 (C5), from C.P. Garcia approach to Kalayaan Avenue Extension. 

Other roads to undergo repair works include Regalado Avenue, from Mindanao Avenue Extension to Quirino Highway, 3rd lane from sidewalk, northbound; J. Fajardo Street, from Matimyas to Quintos Street, northbound; Katipunan Avenue, after Quirino Memorial Medical Center, 2nd lane from sidewalk, southbound; Quirino Highway, from Junji Street to near Teresa Heights, inner lane, eastbound; General Luis Street, from Oriental Tin to Pascual Road, eastbound; and Elliptical Road, before Commonwealth Avenue, 7th lane from sidewalk, outer lane, eastbound. 

LATEST NEWS

Popular Articles