The Energy Regulatory Commission (ERC) approved two point-to- point limited transmission facilities for solar projects, with a combined capacity of 316 megawatt-peak (MWp).
The ERC,...
San Isidro Solar Power Corp. (SISPC) asked the Energy Regulatory Commission (ERC) to approve its application to develop a point-to-point limited facilities costing P1.659...