spot_img
28 C
Philippines
Friday, March 29, 2024

LRT 1 draws up temporary traffic scheme

- Advertisement -

The Light Rail Manila Corporation said  a new temporary passenger traffic scheme  will be implemented in LRT-1 north line composed of Monumento, Balintawak, and Roosevelt stations, effective January 4, 2020 to March 31, 2020. This is to accommodate the construction of the Common Station also known as the Unified Grand Central Station (UGCS) which will connect the systems of LRT-1, MRT-3 and MRT-7. 

Under the temporary passenger traffic scheme, commuters traveling northbound may take the Baclaran-to-Monumento circuit and the Baclaran-to-Balintawak circuit, LRMC said in a statement.

Passengers with Roosevelt station as their last stop are advised to take the Baclaran-to-Balintawak circuit. A special shuttle train will arrive every ten minutes during weekday peak period to exclusively pick up passengers in Balintawak station and shuttle them to Roosevelt station. The same shuttle train will pick-up passengers from Roosevelt station and bring them to Balintawak station where LRT-1 commuters can take the train going southbound.

LRMC Chief Operating Officer Enrico Benipayo said  the Baclaran-to-Monumento circuit will address the heavy passenger volume in Monumento station especially during peak hours. “We want to ensure normal operations in all twenty stations of our existing line while the construction of the common station is ongoing that’s why we have this temporary passenger traffic scheme.”

LRMC will deploy additional crowd marshals and safety teams as well as put up directional signages in the stations. “We will also add signage inside the trains for passengers to easily identify if the last stop of the train is either Monumento or Balintawak,” added Benipayo. 

- Advertisement -

The Common Station is one of the big-ticket projects of the Department of Transportation (DOTr) to enable passengers to seamlessly transfer from one rail line to another.

- Advertisement -

LATEST NEWS

Popular Articles